Everything out
Clear the work area before the crew arrives. For a garage, that means the whole garage: vehicles, boxes, benches, and anything on the slab. The crew needs the concrete and a clear path to it.
KrakenConcrete Coatings
(406) 223-9149
Bozeman, Montana · Job agreement
This is the one-page agreement for a Kraken concrete coating. The photos, the pour video, the materials, your responsibilities, and the warranty are all here. You sign once at the bottom, for the whole thing.
Kraken Concrete Coatings LLC · Emmanuel · krakencoatingsllc@gmail.com
An empty garage, cracks marked, before the coating. This is the condition the crew needs to walk into.
Your side
Clear the work area before the crew arrives. For a garage, that means the whole garage: vehicles, boxes, benches, and anything on the slab. The crew needs the concrete and a clear path to it.
You take care of your own belongings. Kraken does not move, store, or replace items left in the work area. If it matters, it is out before the start.
Be set up at the scheduled start. The door is open, the area is clear, and someone can let the crew in. A job that cannot start on time does not get the preparation this warranty depends on.
The work
Same system Kraken publishes on the site: diamond grinding, crack repair, moisture testing, an epoxy base, decorative flake to full coverage, and a polyaspartic topcoat. A typical garage is installed in as little as one day. Your proposal holds the schedule for your slab.
Cracks get sealed. Moisture gets tested. The coating goes on concrete that has been opened up, not on a dirty slab with a quick wash.
The floor is ground mechanically so the coating can bond. Kraken does not acid-etch this system.
Open floor is not enough. The edges, where the slab meets the wall, get ground so the coating is not thin where tires turn.
Decorative flake goes into the base coat to full coverage. A clear polyaspartic topcoat locks it in. It is UV-stable, built for hot tires, salt, and a Montana winter. Watch the pour before you sign.
This photo is one finished Kraken garage. The colors on your job are the ones you select below. Those are the colors to order.